How Linked Equipment Became Experts in Extraction Labs

Linked Equipment Blog: Extraction Lab Experts | Blog 2 of 4

May 3rd, 2021
By: Anthony Galizia, Linked Equipment

The year is 2021 and states are following hot pursuit one after another to legalize the adult use of Canna-Industry products. It is no doubt that the population has taken a different stance on the industry than previous generations. States like Arizona have moved to fully legalize with 60% of voters approving of Prop 207.

Modular Solutions for Many Industries

In 2015-2016, the Canna, Hemp, and CBD industry started to emerge with Government deregulations. Linked Equipment received several contracts to build labs for vendors in the Hemp Industry. Once it was made legal in California, business really took off. To date, we have more than 50 labs under our belt with labs all over the US.

Our first build was a learning curve that proved Linked Equipment can get anything done. There are numerous safety features that need to be built into the labs and Linked Equipment was eager to perfect them. In actuality, it was a huge learning curve. Linked Equipment took on one particular job that helped us hop the fence and get better at it. We had a little 20-foot lab that had to be approved by the state of Washington. Linked Equipment had our engineers put together the plans and the state of Washington approved them. When we started the build, we had to go through subsequent inspections at each stage of the process while the building was happening. The first inspection went fairly well. By the time, the second inspection took place, the state had changed its code requirements and inspector. The new state inspector traveled to Linked Equipment Headquarters in Phoenix, Arizona to carry out the inspection. The plans Linked Equipment thought would pass had to be restructured. We had to start over from scratch, and it was an expensive education. But at the end of the day, we learned a lot. Our electrical engineers were on-site for 4 to 5 months working in harmony with the construction crews to develop a safe and secure extraction lab. We wound up rebuilding the lab from start to finish and passed the more stringent inspection successfully.

Shipping Container Homeless Shelters, Modular Restroom Solutions & Mobile Restroom Solutions

After that trial by fire, our crews understood exactly what to do at every step. 50 builds and zero accidents later, Linked Equipment is now an expert in building modular extraction labs. While the learning curve was fierce, Linked Equipment accepted the challenge and created a streamlined process to build a safer extraction lab with the right equipment for reliable extraction and safe working environments.

Whitepaper: Linked Equipment Origin Story
(Click Paper Below to Download)

Contact Linked Equipment

Address

3454 E Illini St Phoenix, AZ 85040

Office Hours:

Monday - Friday 8am - 5:30pm

Give Us a Call

602-314-6020

Let's Talk

Our Latest Articles

How A Shipping Container House Can Increase Property Values in Paradise Valley Arizona

Uncategorized

Benefits of Accessory Dwelling Units

Affordable Housing Uncategorized

Using Shipping Containers as Safes

Uncategorized

Key Considerations Before Choosing a Shipping Container Build

Affordable Housing Blog

Top U.S. Cities Leading the Way in Container-Friendly Housing

Affordable Housing Blog

Why Shipping Containers Make Excellent Tornado and Fallout Shelters

Blog

Shipping Container Homes, Mobile Restroom Solutions, Shipping Container Homeless Shelters, Modular Shower Solutions & Modular Restroom Solutions

Modular Shower SolutionsModular Restroom SolutionsShipping Container Kitchens